The new Clubhouse, Whitehaven Golf Club
Margrange carried out the electrical installation at the new Whitehaven Golf Clubhouse including;
The installation of Lutron lighting control panels which allows preset lighting levels, colour changing and lighting designs to suit any occasion,
- Installation of the heating & ventilation control panel and air conditioning wiring,
- Emergency lighting installation & fire alarm installation cabling.
Photo Gallery
N.E.S.L. Building, Beckermet
Margrange carried out the Electrical Installation work for the Main Distribution Panel, Sub-Main Distribution Boards, and Lighting & Small Power installations to the newly built office block and also installed High-Bay lighting and three phase power supplies to the workshop.
Nuclear Engineering Services (NES) specialise in the design, manufacture, assembly, test, installation and commissioning of bespoke solutions for the nuclear decommissioning, defence, and nuclear new build markets.
Photo Gallery